Close Menu
  • Home
  • News
  • Politics
  • Lifestyle
  • Opinion
  • Science
  • World
  • Entertainment
  • Finance
  • Football
Facebook X (Twitter) Instagram Threads
Facebook X (Twitter) Instagram
YFON
  • Home
  • News
  • Politics
  • Lifestyle
  • Opinion
  • Science
  • World
  • Entertainment
  • Finance
  • Football
Subscribe
YFON
Home»Lagos to close Marine Beach Bridge for five months

Lagos to close Marine Beach Bridge for five months

YemieFashBy YemieFashNo CommentsMay 25, 20203 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

The Lagos State Government on Sunday announced a plan to effect partial closure of the Marine Beach Bridge, Apapa, to vehicular movement, from May 27 to Oct. 21.

The state Commissioner for Transportation, Dr Frederic Oladeinde, made the disclosure in a statement in Lagos.

He said that the closure would be to enable repair of the bridge which, he said, was long overdue.

“The repair by the Federal Ministry of Works is long overdue and is vital for the safety of the people of Lagos State, especially motorists that ply the bridge to access different parts of the state.

“Necessary palliative works have been carried out on all alternative routes around the construction site to make them to be in good condition to ease movement during the construction period.

“The repair work, which comprise bearing and expansion joint replacement, is planned to be executed in two phases, with each phase focusing on one lane of the bridge at a time.

” The first phase will be handling the lane inbound Apapa while the second phase will be designated to work on the lane that conveys vehicles outside the axis,” he said.

Oladeinde said that the partial closure of the bridge by Total Gas, inward Apapa, would last for five months.

The commissioner said that the repair was in line with the vision of providing a seamless transportation system in the metropolis.

According to him, motorists inward Wharf Road would be diverted to the other section of the bridge outward Apapa.

Oladeinde said that a contraflow of 200 metres had been designed for vehicles to realign with a proper direction inward Ajegunle or Wharf Road, Apapa.

He said that motorists descending to Total Gas would drive without any hindrance.

The commissioner said that operatives of the Lagos State Traffic Management Authority would be stationed at the construction locations to ease traffic.

Oladeinde appealed to motorists and residents of the area to cooperate with traffic management agencies deployed to the areas.

“The state government expresses its commitment to providing a transportation system that will meet the needs of a larger population in an emerging smart city,” he said.

The News Agency of Nigeria (NAN) reports that the Public Affairs Unit of the State Ministry of Transportation (MOT) had on March 27 announced the closure of the Marine Bridge, partially from March 28 to Aug. 15 for repair.

However, on March 28, the ministry suspended the plan due to the COVID-19 pandemic.

(NAN)

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticlePresidency speaks as Buhari cancels appointments, approvals made by Kyari
Next Article Sanwo-Olu to mark one year in office with projects inauguration
Leave A Reply Cancel Reply

Sports
Sports

BREAKING: Eagles name 23-man squad for must-win world cup qualifiers

By AdeboyeOctober 3, 20250

JUST IN: Osimhen rejects €75m Saudi Arabia’s Al Hilal move

June 8, 2025

Osimhen dances to Yinka Ayefele’s classic amidst family dispute

May 21, 2025

Awoniyi finally out of coma after abdominal surgery

May 15, 2025

JUST IN: Carlo Ancelotti appointed as Brazil head Coach

May 12, 2025
Entertainment
Entertainment

Alcohol consumption not sin – Popular gospel singer, Gaise Baba

By AdeboyeAugust 26, 20250

Geh Geh University’: Tiktoker rakes in $30,000 from viral live session

August 22, 2025

Elderly man sparks online buzz after claiming to be Wizkid’s biological father

June 2, 2025

“God is our true husband” – DJ Cuppy encourages single women over 30

June 1, 2025

Davido, Omah Lay excite fans with teaser for “With You” Video

May 31, 2025
Finance
Finance

Naira gains ground as CBN intervenes, FPI inflows increase

By AdeboyeJune 23, 20250

Naira weakens further to N1,610/$ in parallel market

May 8, 2025

Don’t miss It

Get the news as it unfolds! Don’t miss any news, input your email to subscribe.

Instagram Facebook X (Twitter) TikTok
  • Opinion
  • Health
  • Sports
  • Finance
© 2025 YemieFash Online News Platform. A subsidiary of YemieFash Media. Developed by Hexemty Technologies.

Type above and press Enter to search. Press Esc to cancel.